Priorities and Decisions, a Prepared Example

The page the lectures open: what needs Elena first, the assumption behind the Meridian bid, and the record that keeps the reason.

Arun Nagarathanam · 20 Oct 2026 Template · 22 of 42 in this course

Section 3 · Lectures 3.2 to 3.5

About this page

Prepared fictional example. Elena, Dev, Maya and Meridian Manufacturing are invented for this course. The queue, comparison and record are authored teaching material, not output from an observed agent run.

This is the text of the priorities and decisions page shown in Section 3. The same page, with its four tabs, is in the starter zip as practice/priorities-and-decisions.html.

Files and links

Tab 01 · Lectures 3.1 and 3.2

Attention queue

Elena’s 4 incoming items, separated into decisions needing the leader, prepared drafts ready to inspect, and work waiting on others. The decisions are ranked by consequence of delay, not by urgency stamps.

Elena’s attention queue

Queue groupItem & sourceConsequence & priority orderOwner & return rule
1. Decisions needing Elena (#1 Priority)Peer director request to borrow senior engineer Dev for 3 daysHigh consequence: Dev is lead engineer for Friday’s committed client release; lending Dev delays the release.Elena · Address first today
1. Decisions needing Elena (#2 Priority)Internal formatting request (stamped “Urgent — Due Noon”)Low consequence: Needs Elena’s approval because it changes the department’s report template; no client or delivery impact if decided tomorrow.Elena · Handle after Dev decision
2. Prepared drafts ready to inspectHorizon account progress update draft from yesterday’s check-inReady for inspection; no open decision blocking the team.Elena · Scheduled 3 p.m. review batch
3. Work waiting on othersCloud supplier Q4 tier pricing confirmationWaiting on vendor finance reply (expected Wednesday).Vendor · Return immediately only if commitment is threatened

Tab 02 · Lecture 3.3

Option comparison

Maya’s evaluation of the Meridian Manufacturing 6-week data migration RFP after correcting the plan to check senior integration specialist time instead of total headcount. Both specialists are committed to another client’s launch planned to run into weeks 3 and 4.

Three options for the Meridian bid

OptionCapacity & delivery fitPivotal assumption / risk
Option 1: Full 6-week scopeNeeds both senior integration specialists free for Meridian in weeks 3 and 4.Pivotal assumption: Viable only if the other client’s launch finishes early, by day 10 (end of week 2), with zero spillover. Too risky given the unconfirmed vendor testing schedule.
Option 2: Narrower phased scope (Chosen)Core data setup in weeks 1–4; custom ERP integration moves to week 5 (20 specialist hours).Manageable condition: Protects active client launch while winning Meridian relationship; requires verifying 20 specialist hours in week 5.
Option 3: Decline to bidZero capacity strain.Forfeits strategic manufacturing account unnecessarily when phased start is viable.

Tab 03 · Lecture 3.4

Saved decision record

Saved in the Meridian Proposal project after Maya checks the first draft for two common mistakes: the narrower phased scope must be the confirmed choice, and week-5 specialist hours must stay the fact still to confirm. The draft passes both checks, so Maya approves it without corrections.

File · decision-record-meridian-rfp.md
Meridian Proposal / decision-record-meridian-rfp.md

Confirmed bid scope decision

Confirmed choice: Propose the narrower phased scope (core setup in weeks 1–4; custom integration in week 5).

Reasons & tradeoff: Protects our active client launch commitment while accepting a smaller initial contract value.

Alternatives considered: Full 6-week scope (rejected because it depends on the other launch finishing by day 10); declining to bid (rejected).

Fact still to confirm (before signature): Confirm 20 hours of senior integration specialist availability in week 5 with the engineering lead.

Condition that reopens full scope: If written confirmation arrives before the bid is due on Friday, October 9, at 5 p.m. that the active client launch has passed final testing early enough to free both specialists by day 10, reopen the full 6-week scope option.
Saved in the Meridian Proposal project folder

Tab 04 · Lecture 3.5

Four-part tradeoff explanation

At the midpoint checkpoint, compare a raw AI summary with the 4-part leadership explanation you can now give colleagues.

The 4 parts of a trustworthy decision explanation

PartIn plain language
1. Confirmed choiceWe are proposing the narrower phased scope for Meridian Manufacturing.
2. Protected commitment & accepted tradeoffWe protect our existing client launch commitment while accepting a smaller initial bid.
3. Fact still to confirmWe are still verifying 20 hours of senior integration specialist capacity for week 5 before contract signature.
4. Condition that reopens full scopeIf we receive written confirmation, before the bid is due on Friday, October 9, at 5 p.m., that the active client launch has passed final testing early enough to free both specialists by day 10, we will reopen the full 6-week scope.

More in this section

Keep going

Keep building

More from Aruntastic

Practical courses for people who want to build useful things with AI.

Toolkits and programme

Go deeper

Claude certification practice

Preparing for a Claude certification?

Practice exams written by Arun: 600 questions across 4 mock exams and 2 drill banks. Unofficial preparation, not affiliated with Anthropic.

Keep going

This resource is part of a six-section course.

Follow the lectures on Udemy, then come back here whenever you want the files, requests and notes for a section.

Open the course AI Agents for Leaders Who Have No Time to Learn AI · Udemy